Institutional Deployment Case Study

SunFarm Platform

Deterministic capital modeling for 50 MW solar infrastructure. $90M total basis. 7 financial engines. 14+ funding pathways. 4-entity SPV architecture. All permits secured. Construction-ready.

Executive Overview

The SunFarm Platform is a comprehensive institutional capital deployment system for a shovel-ready 50 MW AC / 59.69 MWp DC bifacial solar photovoltaic plant with 25 MW / 100 MWh lithium iron phosphate battery energy storage, located in Bani, Peravia Province, Dominican Republic. The platform encompasses 7 deterministic financial modeling engines, a 4-entity SPV architecture, 14+ independently modeled funding pathways with term sheets, a 9-covenant governance monitoring system, complete Dominican Republic regulatory compliance stack, and an Express.js live dashboard consuming all financial models in real time.

Total project basis: $90M ($35M acquisition at 26.9% discount to $47.9M appraised value + $55M CAPEX). All permits, concessions, and approvals are secured. Engineering designs are complete at 50 MW, 100 MW, and 140 MW configurations. This system demonstrates deterministic capital structuring applied to real-world energy infrastructure.

Project Specifications

Capacity

50 MW AC / 59.69 MWp DC

Storage

25 MW / 100 MWh LFP BESS

Location

Bani, Peravia Province, Dominican Republic

Land Area

440.68 hectares — Parcela 59 DC-8

Total Basis

$90M ($35M acquisition + $55M CAPEX)

Concession

CNE-CP-0012-2020 — 25-Year Definitive

Grid

138kV — Barra Peravia Solar I&II (4.5km)

Entity

Sunfarming Dom Rep Invest, S.R.L.

Year 1 Revenue — $13.2M Total

PPA Solar

$8.8M

66.7% of revenue

BESS Revenue

$2.5M

18.9% of revenue

Carbon Credits

$1.1M

8.3% of revenue

Agriculture

$0.8M

6.1% of revenue

Financial Modeling Output — 3 Scenarios

MetricConservativeBase CaseAggressive
Levered IRR36.8%43.3%49.8%
NPV @ 8% WACC$69.4M$81.7M$94.0M
Equity Multiple5.7x6.7x7.7x
Min DSCR3.32x3.90x4.49x
Payback Period~4 Years~3 Years~2.5 Years
25-Yr Revenue$337M$397M$457M

Deterministic Modeling Engines — 7 Systems

1

25-Year Cashflow Model

Master cashflow model with DSCR per period, debt service, CFADS, distributions, reinvestment, and terminal value.

2

BESS Revenue Engine

25 MW / 100 MWh LFP with 5-stream revenue: arbitrage, frequency regulation, capacity payments, peak shaving, curtailment recovery.

3

Carbon Credit Engine

~45,000 tCO2e/yr baseline. Verra VCS registration. Forward sale modeling with $12-$45/tCO2e scenario analysis.

4

Capital Stack Sensitivity

126-combination matrix: 7 D/E ratios, 6 interest rates, 3 scenarios. WACC optimization and optimal structure identification.

5

Land Monetization Model

440.68 ha agrivoltaic revenue modeling. Dual-use solar + agriculture. Highway frontage, energy lease, ag lease, expansion land.

6

Token Waterfall Engine

$15M raise, 150K tokens @ $100. Preferred 8%, participation 20%, quarterly distributions, lockup mechanics, stress-tested.

7

Acquisition Impact Model

$35M purchase price integration. Basis adjustment to $90M. IRR sensitivity pre/post acquisition. DSCR analysis with earn-out triggers.

Capital Stack — $90M Total Basis

$33M

37%

Senior Debt

$25M

28%

BESS SPV

$22M

24%

Equity (Token + Direct)

$5M

6%

Carbon Forward

$5M

5%

Mezzanine

Blended WACC: ~5.8% · DSCR: 3.90x · Payback: ~3 Years

Funding Pathways — 14+ Independently Modeled

Green Bond (ICMA)

$30M-$55M6.0-7.5%

Fideicomiso (SIMV Trust)

$20M-$40M8-10% yield

DFI Blended Finance

$25M-$45M3.5-5.5%

Carbon Forward

$5M-$15MUpfront advance

BESS Ring-Fence SPV

$20M-$25MNon-recourse

Political Risk Insurance

Spread -50-150bpsMIGA/OPIC

Sustainability-Linked Loan

$30M-$55MLMA/APLMA

PPP (Ley 47-20)

$30M-$90MBOT/BOOT

ECA Vendor Finance

$15M-$30M4.5-6.0%

Hybrid Token-Bond

$15M8% preferred

Impact Agriculture

$3M-$8MSDG-aligned

Sovereign Partner

10-25% stakeStrategic

YieldCo Exit (Yr 7)

$120M-$180M7-12x EBITDA

Mezzanine Debt

$5M-$15M10-14%

SPV Architecture — 4 Entity Structure

HC

HoldCo

Delaware LLC

Tax optimization, GP/LP structure, management committee

LC

LandCo

DR Entity

440.68 ha titled land, mortgage lien priority, agrivoltaic lease

ES

EnergySPV

DR Entity

PPA counterparty, concession holder, EPC, O&M, lender security

TS

TokenSPV

US Entity

$15M tokenization, Reg D 506(c), distribution mechanics, compliance

Compliance & Permitting — All Secured

CNE Definitive Concession

CNE-CP-0012-2020

Obtained

Official Concession Contract

25-Year Binding (Mar 2023)

Obtained

ETED Grid Interconnection

138kV No-Objection (Feb 2024)

Revalidated 2025

Land Title

Matricula 0500009639 — 440.68 ha

Certified

No-Superposition Cert

CODIA 2667 (Oct 2024)

Completed

Land Appraisal

RD$2,970M (~US$47.9M)

Obtained 2025

Environmental License

License 0379-20

Completed

Decreto 517-25

Government Decree

Obtained

Engineering Design (140 MW)

Jairo Pena — Sept 2024

Completed

Drone Survey & Orthomosaic

302 images — Sept 2025

Completed

Governance & Covenant Monitoring

Real-time covenant monitoring with state-machine escalation: COMPLIANT, WATCH, CURE_PERIOD, DEFAULT. 9 financial covenants across 5 operational and 4 acquisition-specific dimensions. Cascading waterfall redirection, enforcement actions, dispute resolution board, and optional DAO governance overlay.

DSCR

Watch: 1.20xDefault: 1.05x

LLCR

Watch: 1.15xDefault: 1.00x

Debt/Equity

Watch: >80%Default: >90%

Acq. Leverage

Watch: >75%Default: >85%

Price Cap

Watch: >80%Default: >100%

Earn-Out

Watch: <90%Default: <70%

Technical Architecture

Config

Single source of truth — config/project.js drives all 7 engines

Models

7 deterministic JS engines — pure functions, zero external deps

Governance

4 state-machine modules — covenants, enforcement, disputes, DAO

Dashboard

Express.js server — 7 route endpoints, Chart.js visualizations

Data Room

Institutional diligence package — expanded checklists, JSON index

Export

SHA-256 hashed audit bundles — tamper-proof JSON snapshots

Source Document Archive — 400+ Files

18 files

Satellite Imagery

2 files

Title & Certification

2 files

Appraisal & Survey

12 files

Official Permit Package

32 files

Engineering Designs

21 files

Government Records

313 files

Drone Orthomosaic

5 categories

Documentation Indexes

Live Platform

This deployment demonstrates deterministic capital structuring applied to real-world energy infrastructure. Every model, pathway, and governance mechanism is built, tested, and version-controlled.